Training & Medical · Chapter 9

The 12-month training plan

This plan takes you from a trekking base to 6,000 m-peak fitness in 12 months, with weekly training rising from about 6 hours to 13 hours before a taper. After that, each later year repeats the same cycle at higher volume, building toward Everest. Start it 12 months before your first big objective.

The 12-month plan: training hours per week
BaseBuildPeakTaper0481216hrs/wk7h123410h567813h910115h12Month of the plan

From the Physical & Medical Preparation Guide. Hours are the typical weekly load for each phase; the plan sits on top of several years of progressively bigger peaks.

The share of heavy-pack uphill work grows steadily, while strength time falls slightly once the foundation is built. Easy aerobic work stays as the foundation all year.

Phase 1: Base (months 1-4)

Goal: build the aerobic engine and general strength; get used to training consistently.

  • 4-5 easy aerobic sessions per week: running, cycling, or brisk walking in Zone 1-2, 45-75 minutes each.
  • 2 strength sessions per week (full-body, see Section 10).
  • 1 long weekend hike in the Sahyadri, 3-5 hours, starting with 8 kg and adding about 1 kg every 1-2 weeks.
  • Do the aerobic deficiency check (Section 8) at the start and end of the phase.
  • End-of-phase target: 60-75 minutes of easy running without stopping; a 1,000 m hike with 12 kg.

Phase 2: Build (months 5-8)

Goal: make fitness specific to mountains: uphill, with a pack, for hours.

  • 3-4 easy aerobic sessions per week, now mostly uphill: stairs, treadmill at 10-15% incline, hill repeats.
  • 1-2 strength sessions, moving toward muscular endurance.
  • 1 muscular endurance (ME) session per week: slow, heavy uphill carry (15-25% of body weight) for 60-90 minutes.
  • 1 interval session every 7-10 days: for example, 5 x 4 minutes hard uphill with 3 minutes easy.
  • Weekend: long day of 5-7 hours with 12-15 kg; include a back-to-back weekend once a month.

Phase 3: Peak (months 9-11)

Goal: reach your highest volume and simulate expedition days.

  • Back-to-back big days every 2-3 weeks: for example, Saturday 1,500 m gain with 15 kg and Sunday 1,000 m with 12 kg.
  • One long 'test' day per month of 8-10 hours on your feet.
  • Keep 1 strength session per week to maintain what you built.
  • Train in the boots you will climb in (leather mountain boots for 6,000 m peaks) for at least some hikes.
  • Practise eating and drinking on the move, exactly as you will on the mountain.

Phase 4: Taper (final 2-3 weeks)

Goal: arrive rested with full fitness.

  • Cut total volume by 30-50%, but keep a few short efforts to stay sharp.
  • No new exercises, no new shoes, no risky activities.
  • Prioritise sleep, iron-rich food, and staying healthy (avoid crowds and sick people where you can).

Adjusting the plan

  • Monsoon (June-September): Sahyadri trails get slippery. Shift more work to stair climbing in tall buildings, treadmill incline walking, and indoor cycling. Monsoon treks remain good for long, steady days if trails are safe.
  • Missed a week: do not try to 'catch up'. Resume where you were, one step back.
  • Sick with fever or chest infection: stop training until 2-3 days after symptoms end, then restart at half volume.
  • Recovery weeks: every fourth week, drop to about 60-70% of the previous week.